
Photos of Phu Yen province
Go Thi Thung tunnels
Go Thi Thung tunnels is one of the 3 tunnel complexes in Vietnam. Go Thi Thung tunnels was built in May 1964 and completed in August 1965 with total length 1948m, average depth 5m, width 0.8m and height 1.6-1.8m with over 10km crisscrossed trenches making a solid front, a strong base for local militia in the American war.
The relics of Go Thi Thung tunnels include 2 sections covering 27 hectars in area, concentrated mainly in Xuan Thanh hamlet, An Xuan commune of Phu Yen province.
Go Thi Thung tunnels is one of the 3 tunnel complexes in Vietnam. Go Thi Thung tunnels was built in May 1964 and completed in August 1965 with total length 1948m, average depth 5m, width 0.8m and height 1.6-1.8m with over 10km crisscrossed trenches making a solid front, a strong base for local militia in the American war.
The relics of Go Thi Thung tunnels include 2 sections covering 27 hectars in area, concentrated mainly in Xuan Thanh hamlet, An Xuan commune of Phu Yen province.
